Section 5 Formulation of Alternative Plans
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
5-24
5.3.11 Additional On-Site Management Measures
The following environmental management measures have been developed to
provide an increase in spatial extent of natural areas adjacent to or within the
EAA storage reservoirs or to ensure that the project will not adversely affect
downstream natural areas. Since the final alternative will be selected based
upon system-wide benefits, these measures were developed (description, cost,
benefits, etc.) to fit any configuration of storage formulated. These
environmental management measures are separable elements that provide
primarily “local” benefits although they would also contribute to the spatial
extent and functional value of various Everglades natural resources. These
management measures include:
Seepage management buffers – areas that would “catch” seepage waters
and keep seepage waters from surrounding lands.
Aquatic deep water refugia – a place that is kept wet during dry down
that mobile organisms could use and that would keep a healthy “stock”
population (this measure is not intended to add any additional cost to the
project).
Littoral zones – areas around the seepage canals where during high
water, vegetation would provide valuable habitat for aquatic species, as
well as absorb some of the nutrients.
Stormwater treatment area (STA) – a water quality treatment area
associated with the reservoir to provide treatment of the additional
quantity of water to be delivered to the Everglades. The STA could be
designed to operate in conjunction with STA 3/4 or as a stand-alone
treatment cell. This draft PIR does not include any real estate,
engineering, design or construction costs for the proposed stormwater
treatment area, which will be included at a Planning level cost estimate in
the Final PIR. Current rough order of magnitude costs for the proposed
STA include an estimated real estate cost of $8,176,000 and cost estimates
for construction ranging from $57,800,000 to in excess of $150,000,000,
based on comparative costs of similar construction.
5.3.11.1 Seepage Management Buffers
In an effort to help manage seepage from the EAA Storage Reservoirs, it is
recommended that a seepage buffer 200 feet wide be created along the eastern,
northern and western exterior levees of the storage reservoirs to improve the
function of the seepage canals, and potentially provide a secondary benefit as
wildlife habitat. The seepage management buffer will contain a mosaic of
naturally vegetated wetland and terrestrial habitats, which offer the optimum
habitat for a high diversity of species. The buffer will include a 50-foot wide
bench and maintenance area along the toe of the levee to allow for equipment