Section 9 Summary of Coordination and Environmental Compliance
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
9-3
Myers; the Andytown – Corbett and Andytown – Martin 500 kV transmission
lines that run immediately west of and parallel to the L-6 and L-7 levees and
WCA Nos. 1 and 2A; the Levee – Midway 500 kV transmission line that runs
one mile west of these two 500 kV transmission lines until it turns south and
runs long the west side of the North New River Canal, US 27, and STA ¾ (south
of the proposed EAA Reservoirs); and the Andytown – Orange River 500 kV
transmission line that runs along the south side of STA ¾ and the Holey Land,
north of the L-5 levee, the Palm Beach – Broward County line, and WCA No. 3
from US 27 west to Ft. Myers.
Bell South and four fiber optic communications companies (WilTel
Communications, Epik Communications, Broadwing Communications, and
Northstar Communications) have a major underground trunk route that runs
along the west side of US 27 within the FDOT right-of-way for US 27. There are
no cell towers in the immediate vicinity of the EAA Reservoir and canal
enhancement projects.
Except for the major electrical transmission lines along the eastern, northern
and southern portions of the EAA and the major fiber optic lines along US 27,
most of the existing utilities within the EAA study area and the proposed EAA
Reservoir and along the North New River, Miami, and Cross and Bolles canals
are local distribution type facilities that provide service to existing land uses
and/or previous property owners or land uses. Aerial telephone lines are
typically co-located on the same poles with electrical distribution lines under a
cooperative cost-share arrangement between FPL, Bell South and other
telecommunications companies.
There is an existing FPL distribution line along the main east-west drainage
canal that provides power to the on-site pump stations that serve the existing
farming operations on the EAA Reservoir lands (formerly known as the
Talisman Lower Ranch) and previously provided power to the Talisman Sugar
Mill that has since been removed. This distribution line will be removed as part
of the construction of the EAA Reservoirs project. Other remaining distribution
lines in the EAA Reservoirs area will also be removed once the project design
has been finalized and it has been determined if any of them need to remain on
an interim basis for construction purposes.
In the area between the proposed EAA Reservoir and Lake Okeechobee where
there are proposed canal conveyance improvements to the North New River
Canal, there are a number of bridges with telephone and communications lines
and, in some cases, water and sewer lines suspended from them. Most of these
bridges will need to be replaced and the utilities will be relocated as part of the
bridge construction projects. In the case of the proposed canal conveyance
improvements to the Cross and Bolles canals, the need for relocations of existing