
Section 6 The Selected Alternative Plan
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
6-4
FIGURE 6-2: DESIGN LAYOUT
Note: The Design Layout does not show the location of the Proposed STA.
6.1.1 Features
The Project has the following features:
1. Pump Stations
o S-610
o S-611
o Modified G-372
o Modified G-370
2. Structures
o S-601 through S-609 Gated Culverts
3. Canals
o C-601 Canal (Cell 1 Borrow/Seepage/Conveyance)
o C-602 Canal (Cell 2 Borrow/Seepage Canal)
o Improved North New River Canal
Kommentare zu diesen Handbüchern