Section 5 Formulation of Alternative Plans
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
5-68
5.6 PERFORMANCE OF THE NEXT ADDED INCREMENT (NAI)
The programmatic regulations require evaluation of the tentatively selected plan
as the “next-added increment.” The next-added increment analysis evaluates the
effects, or outputs, of the tentatively selected plan as the next project to be added
to the group of already approved CERP projects. This analysis helps illuminate
the amount of benefits the selected alternative plan contributes without regard
to future CERP projects. It also helps to ascertain whether sufficient benefits
would accrue to the selected alternative plan to justify the cost, if no additional
CERP projects (other than those already existing or authorized) were
implemented.
The next added increment analysis used model runs provided by the Interagency
Modeling Center designed specifically for evaluation of the NAI using the start-
up operating plan. Details on the performance measures, evaluation
methodology, and quality index scores used to determine the habitat units (HU)
for each region is described in Appendix C. A discussion of the results follows.
5.6.1 Lake Okeechobee NAI Performance
The NAI model run (NAI-S5A) based on the start-up operating plan
demonstrates the project would produce additional 14,601 AAHUs for Lake
Okeechobee compared to 2050 future-without-project (Table 5-24). In addition,
backpumping values into Lake Okeechobee would be less, reducing loading from
canals containing primarily agricultural run-off (Table 5-25). The project
reduces backpumping by a total volume (over 36 years) of 100,000 acre-feet.
TABLE 5-24: HABITAT UNITS FOR LAKE OKEECHOBEE HIGH WATER
PERFORMANCE MEASURES (PMS) (LO-E3 AND LO-E10 SA) FOR THE FIVE
WETTEST YEARS FROM THE MODELING PERIOD OF RECORD.
2000B3 2050B3 NAIS5a
HUs using high water PMs, wettest years 41760 42004 56605
TABLE 5-25: VOLUME OF BACKPUMPING IN ACRE-FEET FROM THE
EVERGLADES AGRICULTURAL AREA INTO LAKE OKEECHOBEE THROUGH
THE S-2 AND S-3 PUMP STRUCTURES FOR EAASR PROJECT ALTERNATIVES.
2050B3 NAIS5a
S2 total ac-ft 334,497 240,456
S3 total ac-ft 87,484 81,328
Total Volume ac-ft 421,981 321,784