Section 5 Formulation of Alternative Plans
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
5-26
5.3.11.3 Littoral Shelves
Littoral shelves are shallow-water areas around the shorelines of the seepage
canals where sunlight usually penetrates to the bottom. Aquatic vegetation,
such as emergent and submergent plants, can grow in these areas. Not only
would littoral shelves and their associated vegetation provide excellent aquatic
habitat for fish and other aquatic organisms, they would also provide water
quality improvements due to the removal of nutrients by the vegetation, and
increase recreational opportunities, such as fishing. The littoral shelves would
be constructed by scraping down the peat layer.
5.3.11.4 Stormwater Treatment Area (STA)
Operation of the EAA Storage Reservoir project involves capturing and storing
regulatory releases from Lake Okeechobee and runoff from the Everglades
Agricultural Area and subsequently delivering the stored water for to the
Everglades Agricultural Area and to meet hydrologic targets in the Water
Conservation Areas (WCAs) and Everglades National Park (ENP). Although the
alternative plans work in concert with STA 3/4, it is anticipated that the
additional hydraulic and phosphorus loading associated with delivering
additional water to the WCAs and Everglades National Park to meet hydrologic
targets will occasionally exceed the treatment capacity of STA 3/4.
To ensure that water that is to be delivered to the WCAs and Everglades
National Park meets water quality requirements, a conceptual STA is included
as an additional on-site management measure. Additional analysis will be
conducted prior to the Final PIR and during the detailed engineering and design
phase of the project to refine the design, cost, and operations of this STA. The
optimization of the proposed STA may include utilizing a portion of Cell 2 of the
reservoir for water quality treatment.
5.3.12 Costs of Alternative Plans and Components
Construction cost estimates for the various alternatives were made in the Micro-
Computer Aided Cost Estimating System software (MCACES) version 5.31. The
basis of the cost estimates was the scope of work provided by the engineering
technical lead. The scope of work provided a layout of the plan features, a
description of the major feature’s special considerations, quantity calculations,
and specific reference to particular structures. Cost estimates for culvert
spillways, culvert structures, and pump plants were produced in cost models
from quantities provided. The final alternate costs were produced in spreadsheet
format by extending the unit cost produced in MCACES by quantities provided
in Table 5-9. Additional costs for water quality monitoring, recreation features,
and operations and maintenance of recreation features have been developed and