Section 8 Plan Implementation
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
8-3
of magnitude costs for the proposed STA include an estimated real estate cost of
$8,176,000 and cost estimates for construction ranging from $57,800,000 to in
excess of $150,000,000, based on comparative costs of similar construction. A
reconnaissance level cost estimate will be prepared for the Final PIR/EIS.
Additional analysis will be conducted during the detailed engineering and design
phase of the project to refine the design, costs, and operations of the stormwater
treatment area
8.1.3 Implementation of Project Operations
The Draft Project Operating Manual for the EAA Storage Reservoir Project (see
Annex D) will be modified and revised, as necessary, through several project
phases. During the Detailed Design and Plans and Specifications Phase, the
Draft Project Operating Manual will be modified as needed to define temporary
operations to be used during construction. These temporary operations are also
known as Interim Operations during Construction. As construction of the
project nears completion, the Draft Project Operating Manual will be further
modified to focus on operations during the Operational Testing and Monitoring
Phase. Knowledge gained from the Operational Testing and Monitoring Phase
will then be incorporated into a revision of the Draft Project Operating Manual,
which will be coordinated with SFWMD and the USACE South Atlantic Division
(SAD), and will supersede all other iterations of the Draft Operating Manual.
The final version of the Project Operating Manual will be used by SFWMD when
the SFWMD accepts responsibility for long-term operations of the project.
8.2 COST SHARING
Responsibilities for implementing the Selected Plan will be shared by USACE,
on behalf of the Federal government, and the non-Federal sponsor, SFWMD.
The USACE and SFWMD will cost-share equally in the design of the projects
resulting from this plan. The SFWMD has acquired the necessary lands,
easements, rights-of-way, relocation, and disposal areas (collectively referred to
as LERRD); and operate and maintain the completed project. Construction
contracts to build the projects will be managed by either USACE or SFWMD to
maintain as close to a 50/50 cost share as possible to meet the overall CERP
program goal of a 50/50 federal/non-federal cost share.
Rules, which determine how project responsibilities are shared, are established
in Federal law and the Administration's implementing policies. Section 601 of
WRDA 2000 provides in-kind cost sharing credit to the non-Federal sponsor for
design, construction, and operational and maintenance and for treatment of
credit between projects to maintain a 50/50 cost share. The PIR recommends
crediting the non-Federal sponsor for work completed under the Acceler8
program in advance of approval and authorization of the Federal project. Also,
since recreational opportunities are one of the original CERP objectives,