Section 6 The Selected Alternative Plan
EAA Storage Reservoirs Revised Draft PIR and EIS February 2006
6-11
Cut-off walls will be installed as part of the levee or embankment construction.
For earthen embankments, the estimated depth of the cut-off wall is 35 feet
along the east, north, west, and STA3/4 sides of the reservoir. A 50-foot deep
cut-off wall will be installed along the Holey Land area.
6.1.8 Bridges
The S-609 box culvert structure will be constructed underneath U.S. Highway
27. This structure will serve as a hydraulic connection between the EAA
reservoir and the North New River Canal. More detail on structure S-609 is
provided in Section A-2.4.2.2.1.2 and Plate C-5 in the Engineering Appendix
(Appendix A).
Bridge relocations/replacements will be required due to channel improvements
in the Miami, North New River, Bolles and Cross Canals. Improvements to the
Miami Canal will necessitate the replacement of 2 bridges. Improvements to the
North New River Canal will necessitate the replacement of 7 bridges.
Improvements to the Bolles Canal will necessitate the replacement of 3 bridges.
Improvements to the Cross Canal will necessitate the replacement of 5 bridges.
6.1.9 Stormwater Treatment Area
Operation of the EAA Storage Reservoir selected plan involves capturing and
storing regulatory releases from Lake Okeechobee and runoff from the
Everglades Agricultural Area and subsequently delivering the stored water for
both water supplies to the Everglades Agricultural Area and to meet hydrologic
targets in the WCAs and Everglades National Park. Although the selected plan
works in concert with STA 3/4, it is anticipated that the additional hydraulic and
phosphorus loading associated with delivering additional water to the WCAs and
Everglades National Park to meet hydrologic targets will occasionally exceed the
treatment capacity of STA 3/4. To ensure that water that is to be delivered to
the WCAs and Everglades National Park meets water quality requirements, a
conceptual STA is included in the EAA Storage Reservoir selected plan.
Approximately 1,495 acres of land already owned by the State of Florida and the
South Florida Water Management District adjacent to and in the southwest
corner of the reservoir have been identified as the likely site for the STA.
Additional analysis will be conducted prior to the Final PIR and during the
detailed engineering and design phase of the project to refine the design, cost,
and operations of this storm water treatment area. Sizing and optimization of
the proposed STA may include converting a portion of Cell 2 to a STA as well.